In the Kaa-Khem district of the Tyva Republic, there is a gold recovery plant LLC Tardan Gold, which is a part of the Auriant Mining group of companies (Sweden) and is engaged in the extraction and processing of gold-bearing ores. Currently, the heap leaching process is used, but recently the mining technology has started to […]
The designed length of Elegest-Kyzyl-Kuragino railway is 410 km, and its main purpose is export up to 15 million tons of coal per year from the Elegest field (Republic of Tuva) and connection to the Trans-Siberian railway. The transport infrastructure will be developed simultaneously with the mining and concentration facility at the field. The project […]
The project is designed to establish Russia’s third largest (after the Ural and Norilsk) non-ferrous metallurgy centre with a prospect of high-efficiency production development. The project will set a new mining and metallurgic industry growth benchmark on the basis of unique platinum-copper-nickel and copper-molybdenum deposits in the south of the Krasnoyarsk Region and the Republic […]
The objective of the project is to increase the carriage and traffic capacity of the section, to provide for the uninterrupted export of goods to be shipped by railway, to increase the traffic efficiency by means of new construction and reconstruction of the common infrastructure. Investor: Russian Railways OJSC (Krasnoyarsk Railway – Branch of Russian Railways […]
Purchase of production capacity increasing equipment. Investor: SUEK-Khakassia LLC Delivery period: 2019–2023 Investment: 8 million dollars
Purchase of production capacity increasing equipment. Investor: SUEK-Khakassia LLC Delivery period: 2020–2022 Investment: 23 million dollars
Purchase of the equipment for the maintenance of the production capacity. Investor: SUEK-Khakassia, LLC Delivery period: 2018–2022 Investment: 102 million dollars
Establishment of transport infrastructure for export of the products released by companies engaged in exploration and development of Beyskoe bituminous coal field. Investor: Temporary Operation Department, JSC (OVE, JSC) Delivery period: 2018–2022 Investment: 78 million dollars
Construction of a transport corridor to make the shortest connection of the Republic of Khakassia to the regions of Siberia. Investors: Ministry of Transport and Roads of the Republic of Khakassia (State Institution of the Republic of Khakassia “The Republic of Khakassia Motor Roads Administration”) Delivery period: 2019–2024 Investment: 0,9 billion dollars
Increasing the aluminium strip production by 50 thousand tons per year for further production of the spacer frames, transformer strips, automotive insulation, screw caps, composite panels, sandwich panels. Investor: RUSAL SAYANAL, JSC Delivery period: 2019–2027 Investment: 77 million dollars