Development of the Tardan ore gold deposit

In the Kaa-Khem district of the Tyva Republic, there is a gold recovery plant LLC Tardan Gold, which is a part of the Auriant Mining group of companies (Sweden) and is engaged in the extraction and processing of gold-bearing ores. Currently, the heap leaching process is used, but recently the mining technology has started to […]

Elegest-Kyzyl-Kuragino Railway Construction

The designed length of Elegest-Kyzyl-Kuragino railway is 410 km, and its main purpose is export up to 15 million tons of coal per year from the Elegest field (Republic of Tuva) and connection to the Trans-Siberian railway. The transport infrastructure will be developed simultaneously with the mining and concentration facility at the field. The project […]

Battery metal production company establishment

The project is designed to establish Russia’s third largest (after the Ural and Norilsk) non-ferrous metallurgy centre with a prospect of high-efficiency production development. The project will set a new mining and metallurgic industry growth benchmark on the basis of unique platinum-copper-nickel and copper-molybdenum deposits in the south of the Krasnoyarsk Region and the Republic […]

Increase of the carriage capacity of Artyshta-Mezhdurechensk-Tayshet railway section

The objective of the project is to increase the carriage and traffic capacity of the section, to provide for the uninterrupted export of goods to be shipped by railway, to increase the traffic efficiency by means of new construction and reconstruction of the common infrastructure. Investor: Russian Railways OJSC (Krasnoyarsk Railway – Branch of Russian Railways […]

Construction of Abakan-Biysk motorway (transport corridor)

Construction of a transport corridor to make the shortest connection of the Republic of Khakassia to the regions of Siberia. Investors: Ministry of Transport and Roads of the Republic of Khakassia (State Institution of the Republic of Khakassia “The Republic of Khakassia Motor Roads Administration”) Delivery period: 2019–2024 Investment: 0,9 billion dollars 

Development and modernization of RUSAL SAYANAL JSC plant

Increasing the aluminium strip production by 50 thousand tons per year for further production of the spacer frames, transformer strips, automotive insulation, screw caps, composite panels, sandwich panels. Investor: RUSAL SAYANAL, JSC Delivery period: 2019–2027 Investment: 77 million dollars