The designed length of Elegest-Kyzyl-Kuragino railway is 410 km, and its main purpose is export up to 15 million tons of coal per year from the Elegest field (Republic of Tuva) and connection to the Trans-Siberian railway. The transport infrastructure will be developed simultaneously with the mining and concentration facility at the field. The project is based on the concession agreement with the validity term of 30 years.


Investor: Tuvan Energy Industrial Corporation JSC


Delivery period: 2019–2024


Investment: 5,7 billion dollars